Results 1 - 5 from 5 for "max boegl"
-
Max Boegl Resumes EUR150M Wind Farm Project
04.08.2021
Energia Mileniului III, a company equally owned by Germany’s Max Boegl International and BTG Wide Consulting, will resume construction of a 99 MW wind farm in Tulcea, having recently received a new more
-
Max Boegl Romania CEO Steps Down
10.25.2013
Romeo Botocan resigned from the position of Chief Executive Officer (CEO) of the Romanian subsidiary of German constructor Max Boegl in July this year. more
-
Romania Signs RON498.8M Highway Section Contract With Astaldi-Max Boegl Consortium
09.21.2011
Romania’s national roads authority CNADNR signed a 498.8 million lei (about EUR116.24 million), net of VAT, contract with Italian-German consortium Astaldi-Max Boegl, which will design and build the more
-
Basarab Overpass Builders Set To Complete Cernavoda-Medgidia Highway With EUR120M
09.06.2011
2011’s hottest infrastructure project, the construction of the Cernavoda-Medgidia section, finally has neared a conclusion. Italy’s Astaldi and Germany’s Max Boegl will finish in the second half more
-
Astaldi, Max Boegl To Construct Cernavoda-Medgidia Highway Section For EUR119M
09.05.2011
The Astaldi - Max Boegl consortium was awarded a contract to design and construct the Cernavoda-Medgidia highway section in southeastern Romania, national roads authority CNADNR said Monday. more